This week on the Lake House:
We delivered all the sheetrock - 175 boards of 12 foot long
Boomed the sheetrock into the second floor .
JAFCO delivered the sheetrock , they did a great job and on time, thanks guys.
Johnny G Tile laid down the subfloor. Comes all the way up from Belmar. Johnny came over for dinner afterwards.
Bravo's craftsmanship in one day. 3 crews , what a team.
Bravo Construction came over and did the stone exterior. They really lived up to their name .. Bravo ! They did the wire lath , then a scratch coat of cement, then they put on the stone. Natural stones , various large sizes.